You're reading the public documentation. Links to screens inside PrintERP will ask you to sign in first.

Maintenance schedules and status

Schedule by months or by pieces produced, and read the approaching / due / overdue signal.

PrintERP tracks when each machine is next due for service, logs the work when it happens, and keeps the history. The point is to service presses before they fail in the middle of a deadline.

Two ways to schedule

TypeMeasured inSuits
MonthsTime since the last completed serviceAge-related wear — belts, lubrication, seals
ProductionPieces produced since the last serviceUse-related wear — heads, blades, rollers

Set the type and interval when you add or edit the machine. A monthly schedule with an interval of 3 reads as “every 3 months”; a production schedule with 10,000 reads as “every 10,000 pieces produced”.

Tip

Pick whichever the manufacturer specifies. If a machine is idle for months at a time, a production schedule avoids nagging you about a press nobody has touched.

Reading the status

LevelMeaning
No scheduleNothing configured, or no maintenance ever logged
OKComfortably inside the interval
Approaching80% of the way through — start planning
DueThe interval has been reached
Overdue125% of the interval — well past

Why a monthly schedule shows nothing at first

A time-based schedule measures from the last completed service, so with no maintenance history there is no baseline to measure from — the status reads “no maintenance logged yet” rather than inventing a start date. Log one service and the clock begins.

Partial months only count once the day of the month has passed, so a machine serviced on the 20th does not tick over on the 1st.

Maintenance jobs

Work is tracked as a maintenance job on the machine's detail page. Each has a kind — Scheduled, Emergency or Repair — plus a description, the date it was sent out, parts replaced, cost and who performed it.

Completing a job stamps it complete and writes a permanent maintenance record in the same step, resetting the machine's clock. Emergency and repair work is worth logging even when unscheduled — it is what tells you a press is becoming a liability.

Maintenance cost

Note

The cost on a maintenance job is a record against the machine. To have it appear in your profit and loss, also record it in Expenses — see Tracking expenses.

Open Machines

Check which machines are due.

Open →